Before requesting more power
Contracted power limit should not be increased before confirming that the incoming supply, panel and protection can carry the new current. It is also important to establish whether the problem is truly insufficient power or poor load distribution.
Items normally assessed
- Current and requested power limits, and the maximum permitted supply capacity;
- Size and condition of the incoming supply;
- Main switch and electrical panel capacity;
- Single-phase and three-phase loads;
- Protection and earthing;
- Any changes required to the installation.
Single-phase and three-phase changes
The correct choice depends on the loads, installation and power required. Three-phase equipment, load balance and conductor capacity must be considered before requesting a change from the network operator.
Electrical installation declarations
The technician’s declaration (termo de responsabilidade) does not replace a compliant electrical installation. Before it is issued, the work must be known, inspected and appropriately tested.